AIV-FV Photos can be found here .

PTR (Post Test Review) @ 11:00  2014-06-06 PTR     Test Run #3      SFT-FV run in A0 configuration   FUNC VER Start: 10:30:00 Stop: 11:30:00   ORB LOAD Start: 13:10:00 Stop:    See Timing     FUNC_VER   10:45:00 [00:15:00]     BELA...

Test Run #2:      SFT-FV run in B0 configuration   FUNC VER Start: 9:45:00 Stop: 10:45   ORB LOAD Start: 12:25:00 Stop:    See Timing     ORB_LOAD   00:01:19     PHEBUS selective [PID 72, PS 39] + low-prior [VC3: PID 70, PS 23]  00:11:01    ...

AIVJune2014

AIVJune2014