Programme - JUICE SWT Meeting
Programme
OVERVIEW
|
|
Monday 10 November |
Tuesday 11 November |
Wednesday 12 November |
Thursday 13 November (Auditorium) |
Friday 14 November (Auditorium) |
|
Morning |
|
[Armistice day in Belgium and France]
SWI team meeting
|
Science WGs splinters (WG1&2,3&4) |
SWT plenary (ESA + other selected reports)
|
SOWG
Adjourn 13:00
|
|
Afternoon |
SWI team meeting |
SWI team meeting
|
Science WGs splinters (part 2)
Cartography task group (2h)
Radiation WG splinter (1.5 h)
|
SWT plenary
DHAWG (1.5 h)
[16:00-18:00 Splinter Kallichore, limited attendance with invitation] |
Guided walking tour downtown Göttingen TBC
|
|
Evening |
|
|
Public talk and Reception in the foyer |
Social dinner (at own cost) |
|
DETAILED AGENDA
Wednesday 12th November
|
Rooms E+F (ground floor) |
Auditorium |
Room A+D (ground floor) |
|
|
|
|
WG1 & WG2 combined splinter session: Requirement of DTM generation by WG2 for WG1 data processing/science
- Science requirements, observation constraints, and preliminary analysis of A3 coverage related to JANUS DTMs
- DEM requirements for RIME
- Generation of topographic models from GALA altimetry and their integration with local DEMs derived from camera data
-
Discussion
WG1 splinter: Callisto science case
- 3GM radio science measurements at Callisto
- GALA altimetric measurements at Callisto
- J-MAG magnetic measurements at Callisto
- Discussion
WG2 splinter
- WG2 news and digest if recent science
- Science operations during the low altitude flyby phase (approx CA +/- 2h), using ORB17 Callisto flyby 16C9
- Science teams presentations (JANUS, MAJIS, UVS, SWI, GALA, RIME, PEP, 3GM)
- Open issues for instrument synergy in preparation of the synergy workshop, including feedback from ORB17
- WG2: L0 DV: where we are and what are the implications
- "Analogue sample/compounds" activity: status
WG3 & WG4 combined splinter session
- Recap on instrument pointing constraints: FoVs, overlaps & conflicts
- Multi-instrument synergistic science case for high-latitude observations
- JUICE magnetic trajectory for high-latitude observations
- Relevant tools/datasets
WG4 splinter
- Roadmap to the observation strategy workshop
- Synergies between WG4 instruments
- Next planning exercise: 3GM occultation
- WG4-member list
JUICE Task Group for Satellites Coordinate Systems, Cartography and Nomenclature
- Updates to the reference frames of Galilean satellites
- Lunar reference frame for JUICE LEGA observations
- Targets/Regions of interest for JUICE
Radiation splinter
- Project status
- Report on the radiation model update
- Report on task 4
- Report on the Ganymede shielding activities
- Discussion
18:00 Adjourn
19:00 Reception at the foyer
Evening Talk by Joanna Drazkowska on Solar System Formation
Thursday 13th November
Science Working Team (SWT) meeting [09:00-15:30]- Auditorium
09:00 Welcome, logistics & introduction (Norbert Krupp, Paul Hartogh, O. Witasse) [20m]
09:20 Project status and SOC news (N. Altobelli) [20min]
09:40 Project scientist report (O. Witasse)[15min]
09:55 MOC report (A. Dietz) [15min]
10:10 Flight Dynamics report (F. Budnik, C. Aldebert): Venus flyby, latest delta-V budget (action from last SWT), pointing campaign overview and the ATLAS observation campaign [15 min]
10:25 Mission Analysis report (A. Boutonnet) [15 min]
10:40 coffee break
11:10 Working group reports (leads) [5 x 10 min]
12:00 Juice-Clipper Steering Committee report (E. Bunce)[10min]
12:10 Radiation working group status (S. Kotsiaros) [10 min]
12:20 Margins for remaining PI reports [20 min]
12:40 lunch break
14:10 Invited talk on 3I/ATLAS (Dominique Bockelee) [30min]
14:40 Kallichore flyby [45 min]
-
Status report (N. Altobelli, O. Witasse)
-
Observation requests from instrument teams (quick report)
-
Report on ground-based observations (V. Lainey, O. Witasse)
-
Discussion (all)
15:30 coffee break
Data Handling and Archiving Working Group (DHAWG) [16:00-17:30] - Auditorium
16:00-16:05 Introduction [5 min]
16:05-16:25 SOC Downlink news [20 min]
16:25-16:35 Planetary Science Archive (PSA) news [10 min]
16:35-16:45 JUICE archive news [10 min]
16:45-16:55 SPICE news (relevant to DHA) [10 min]
16:55-17:25 Archive planning during the Cruise phase [30 min]
17:25-17:30 AOB [5 min]
17:30 End of meeting
19:30 Social dinner (at own cost) in Gottingen
Friday 14th November
Science Operations Working Group (SOWG) meeting [09:00-13:00]- Auditorium
09:00-09:10 – Introduction & actions review
09:10-09:50 - Operations status: next cruise milestones- Atlas, Payload checkout 4, Payload checkout 5, Earth Gravity Assist 2, Earth Gravity Assist 2 dry run [MOC,SOC]
09:50-10:00 - SPICE status [ESA Spice Service]
10:00-10:20 - Progress status on SSMM modelling and selective downlink process, requirement definition [SOC]
10:20-10:40 - SOC Planning Files and Modelling Updates [SOC]
10:40 coffee break
11:10-11:30 – Strategic planning overview
11:30-12:15 - Next planning scenario: case presentation, SOC tools & process update, schedule presentation [45min] [SOC]
12:15-12:30 - Preparation for the synergies workshop [OS, WG leads] [15min]
12:30-13:00 margin, AoB and conclusions [30min]
13:00 Adjourn