AIV-FV (day 4)

PTR (Post Test Review) @ 11:00 
 
 
Test Run #3     
SFT-FV run in A0 configuration
 
FUNC VER
Start: 10:30:00
Stop: 11:30:00
 
ORB LOAD
Start: 13:10:00
Stop: 
 
See Timing
 
 
FUNC_VER
 
10:45:00 [00:15:00]     BELA high priority data via VC2 [ PID 65, PS 15 ]
> Checked 
 
10:59:39 [00:29:39]     PHEBUS start of high priority data via VC2 [ PID 71, PS 24 ]
11:24:51 [00:54:51]     PHEBUS end of high priority data via VC2
> Checked 
> Selective (accumulated data): MGNS (14)
 
 
ORB_LOAD
 
13:11:19 [00:01:19]     PHEBUS selective [PID 72, PS 39] + low-prior [VC3: PID 70, PS 23] 
13:21:01 [00:11:01]     PHEBUS end of selective + low-prior
> Checked 
> Selective (accumulated data): PHEBUS (38)
 
13:22:20 [00:12:20]     MERTIS start of hi-prior data [VC2: PID 63, PS 19 ]
13:23:20 [00:13:20]     MERTIS end of hi-prior data
> Checked 
> Selective (accumulated data): PHEBUS (38), MGNS (17), MERMAG (1)
   
13:53:03 [00:43:03]     SIMBIO: STC start of hi-prior data (255 frames) [ VC2: PID 55, PS 30 ]
13:53:27 [00:43:27]     SIMBIO: STC end of hi-prior data
 
13:54:03 [00:44:03]     SIMBIO: VIHI start of hi-prior data (255 frames) [ VC2: PID 56, PS 30 ]
13:56:05 [00:46:05]     SIMBIO: VIHI end of hi-prior data 
 
14:10:08 [01:00:08]     SIMBIO: STC, VIHI start of hi-prior data (10 frames) via VC2 [ PID 55-56, PS 30 ]
14:10:08 [01:00:08]     SIMBIO: HRIC start of hi-prior data (255 frames) via VC2 [ PID 54, PS 30 ]
!! Check order of downlink data (in particular low priority) 
> SGS leaves to the airport
 
14:22:50 [01:12:50]     PHEBUS start of selective downlink [VC2: PI 71, PS 24 ] [SDD: PI 72, PS 39 ]
14:28:41 [01:18:41]     PHEBUS end of selective downlink 
 
 
ITL Updates
No updates needed prior to the test.
 
AI# PHEBUS ITL FUNC VER to be updated after this run for future runs
 
SSMM Configuration Problems
None
 
Instrument Problems
  • FUNC PERF
    • SIXS: Event for SIXS-X mode change and telecommand execution acknowledgement.
  • ORB LOAD
    • SIMBIO: HRIC flexible downlink not produced.
Others
None