PTR (Post Test Review) @ 11:00 2014-06-06 PTR Test Run #3 SFT-FV run in A0 configuration FUNC VER Start: 10:30:00 Stop: 11:30:00 ORB LOAD Start: 13:10:00 Stop: See Timing FUNC_VER 10:45:00 [00:15:00] BELA...
Ranpal Gill
-
05/06/14
Test Run #2: SFT-FV run in B0 configuration FUNC VER Start: 9:45:00 Stop: 10:45 ORB LOAD Start: 12:25:00 Stop: See Timing ORB_LOAD 00:01:19 PHEBUS selective [PID 72, PS 39] + low-prior [VC3: PID 70, PS 23] 00:11:01 ...