EnVision acronyms - EnVision
Envision Acronym List
ESA reference: ESA-ENVIS-EST-MAN-LI-008
| Acronym | Description |
|---|---|
| AAEU | Actual Azimuth, Elevation, Unit look-direction frame |
| AC | Alternating Current |
| AD | Applicable Document |
| ADB | Action DataBase |
| ADEV | Allan Deviation (frequency stability) |
| AFT | Allowable Flight Temperature |
| AIT | Assembly, Integration and Test |
| AIV | Assembly, Integration, & Verification |
| AIVR | AIVR\tAssembly, Integration, & Verification Requirements |
| AKE | Absolute Knowledge Error |
| ALM | Apocytherion or Apocentre Lowering Manoeuvre |
| ALT | Along Track |
| ANC | Ancillary Data |
| AOC | Attitude and Orbit Control |
| AOCS | Attitude and Orbit Control System |
| AOP | Argument Of Pericentre |
| APE | Absolute Pointing Error |
| APID | Application Identifier |
| AR | Acceptance Review |
| ARES | Aerobraking Reference Environment Specification |
| ARM | Apocentre Raising Manoeuvre |
| ASM | Analog Signal Monitoring |
| ATD | Acronyms, Terms and Definition |
| AU | Astronomical Units |
| AUX | Auxiliary data |
| BC | Ballistic Coefficient |
| BIRA-IASB | Royal Belgian Institute for Space Aeronomy |
| BOL | Beginning of Life |
| CaC | Cost at Completion |
| CAL | Calibration data |
| CAL/VAL | Calibration and Validation |
| CAM | Collision Avoidance Manoeuvre |
| CBS | Cost Breakdown Structure |
| CCDB | Calibration and Characterisation DataBase |
| CCN | Contract Change Notice |
| CCR | Contract Change Request |
| CCS | Command and Control Subsystem |
| CCSDS | Consultative Committee for Space Data Systems |
| CCU | Common Control Unit (VenSpec) |
| CDM | Conceptual Data Model |
| CDR | Critical Design Review |
| CFDP | CCSDS File Delivery Protocol |
| CFI | Customer Furnished Item |
| CIDL | Configuration Item Data List |
| CLA | Coupled Loads Analysis |
| COC | Certificate of Conformance |
| CoG | Center of Gravity |
| CoM | Centre of Mass |
| COM | (in orbit) Commissioning Phase |
| CP | Chemical Propulsion |
| CPI | Contractor Provided Item |
| CPPA | Centralized Parts Procurement Agent |
| CPU | Central Processing Unit |
| CReMA | Consolidated Report on Mission Analysis |
| CRM | Critical Raw Materials |
| CRP | Contingency Recovery Procedure |
| CSG | Centre Spatial Guyanais |
| CTE | Coefficient of Thermal Expansion |
| CV | Cosmic Vision |
| D/SCI | Director for the Science Directorate, ESA |
| DART | Definition, Acronyms and Reference Terms |
| DIS | Disposal phase |
| DAEU | Desired Azimuth, Elevation, Unit look-direction frame |
| DART | Definitions, Acronyms and Reference Terms |
| DBL | Document Baseline List |
| DC | Direct Current |
| DCL | Declared Components List |
| DCP | Decommissioning Phase |
| DDID | Data Disposition Interface Document |
| DDOR | Delta-Differential One-way Ranging |
| DDS | Data Disposition System |
| DDV | Design, Development and Verification |
| DEA | Digital Electronics Assembly |
| DEM | Digital Elevation Model |
| DHS | Data Handling System |
| DHU | Data Handling Unit |
| DIS | Disposal phase |
| DISL | Deliverable Items and Services List |
| DLL | Design Limit Load |
| DLR | German Aerospace Center |
| DM | Development Manager |
| DML | Declared Materials List |
| DMPL | Declared Materials and Processes List |
| DN | Digital Number |
| DPL | Declared Processes List |
| DQR | Data Quality Rating |
| DRB | Data Review Board |
| DRD | Document Requirement Description |
| DRL | Document Requirement List |
| DSA | Deep-Space Antenna |
| DSM | Deep Space Manoeuvre |
| DSN | Deep Space Network |
| DV | Delta Velocity |
| E field | Electric field |
| EBB | Elegant Bread Board |
| EEM | Earth Escape Manoeuvre |
| EES | Earth Escape Sequence |
| ECSS | European Cooperation for Space Standardization |
| EDAC | Error Detection And Correction |
| EDDS | EGNOS Data Dissemination System |
| EEE | Electrical, Electronic and Electromechanical |
| EFM | Electrical Functional Model |
| EGSE | Electrical Ground Support Equipment |
| EID-A | Experiment Interface Document, Part A |
| EID-B | Experiment Interface Document, Part B |
| EIDP | End Item Data Package |
| EIRP | Effective Isotropic Radiated Power |
| EMC | Electro-Magnetic Compatibility |
| EM | Engineering Model |
| EME2000 | Earth’s Mean Equator and Equinox at 2000-01-01 12:00 (J2000 Frame) |
| ENV-GS-DR-# | Drivers for the Envision ground segment requirements definition |
| EOL | En Of Life |
| EPS | Electric Power System |
| EPSC | EuroPlanet Science Congress |
| EQM | Engineering Qualification Model |
| EQML | European Qualified Manufacturers List |
| EQSR | Engineering Qualification Status Review |
| EQSOL | EQuipment Switch-Off Lines |
| ESA | European Space Agency |
| ESAC | European Science and Astronomy Centre |
| ESB | Earth Swing-By |
| ESI | European Standard Initiator |
| ESOC | European Space Operations Centre |
| ESP | Extended Science Phase |
| ESRA | Effective Spectral Radiometric Accuracy |
| ESTEC | European Space Technology Centre |
| ESTRACK | Network of European Tracking Stations |
| ETB | Engineering Test Bed |
| FAT | Factory Acceptance Test |
| FAR | Flight Acceptance Review |
| FCV | Flow Control Valve |
| FDDB | Flight Dynamics DataBase |
| FDIR | Failure Detection, Isolation, and Recovery |
| FDP | Final Datapack |
| FEE | Front-End Electronics |
| FEM | Finite Elements Model |
| FER | Frame Error Rate |
| FFT | Full Functional Test |
| FGSE | Fuelling Ground Support Equipment |
| FLSR | Final Launch Site Review |
| FM | Flight Model |
| FMAR | Final Mission Analysis Review |
| FMEA | Failure Mode and Effects Analysis |
| FMECA | Failure Mode, Effects and Criticality Analysis |
| FOD | Flight Operations Director |
| FOM | Flight Operations Manual |
| FOP | Flight Operations Plan |
| FoV | Field of View, sometimes also (optical) field of view |
| FP | Final Presentation |
| FPGA | Field-Programmable Gate Array |
| FR | Final Review |
| FRM | Flux Reduction Manoeuvre |
| FRR | Flight Readiness Review |
| FSS | Fine Sun Sensor |
| FTP | File Transfer Protocol |
| FWHM | Full Width Half Maximum |
| GAM | Gravity Assist Manoeuvre |
| GDIR | General Design and Interface Requirements |
| GL | Gravity Losses |
| GMM | Geometrical Mathematical Model |
| GS | Ground Segment |
| GSDR | Ground Segment Design Review |
| GSE | Ground Support Equipment |
| GSI | Ground Segment Interface |
| GSIR | Ground Segment Implementation Review |
| GSM | Ground Segment Manager |
| GSRqR | Ground Segment Requirement Review |
| GSRR | Ground Segment Readiness Review |
| GST | Ground Segment Team |
| HEO | Highly Elliptical Orbit |
| HF | High Frequency (radar frequency band) |
| HGA | High-Gain Antenna |
| HH | HH polarization, radar |
| HK | House Keeping |
| HKTM | House Keeping TeleMetry |
| HPA | High Power Amplifier |
| HR | High spectral Resolution channel of VenSpec-U |
| HV | HV polarization, radar |
| ICD | Interface Control Document |
| ICM | Inclination Correction Manoeuvre |
| ICRF | International Celestial Reference Frame |
| IFoV | Instantaneous Field Of View |
| IGST | Integrated Ground System Test |
| ILS | Instrument Lead Scientist (formerly called instrument PI) |
| IOCR | In-Orbit Commissioning Review |
| IPP | Industrial Procurement Plan |
| IMU | Inertial Measurement Unit |
| InSAR | Interferometric Synthetic Aperture Radar |
| IOR | Instrument Operations Request |
| IPR | Intellectual Property Rights |
| IRD | Interface Requirements Document |
| ISO | International Standardisation Organisation |
| ISP | Instrument Source Packet |
| ISRR | Intermediate System Requirements Review |
| IST | Integrated System Tests |
| ISVV | Intermediate System Requirements Review |
| ITP | Interplanetary Transfer Phase |
| ITT | Invitation to Tender |
| k2 | k2 Love number, measure for the level of central condensation of an object |
| Ka band | Ka-band (26–40 GHz) radio frequency |
| LATMOS | Laboratoire Atmosphères, Observations Spatiales |
| LCA | Life Cycle Assessment |
| LCI | Life Cycle Inventory |
| LCL | Latching Current Limiter |
| LEOP | Launch and Early Operations Phase |
| LGA | Low-Gain Antenna |
| LIC | Launcher Injection Correction |
| LIT | Listen-In Test |
| LLI | Long Lead Item |
| LoS | Line of Sight |
| LP | Launch Period |
| LPO | Launch Period Open |
| LPC | Launch Period Close |
| LR | Low spectral Resolution channel of VenSpec-U |
| LRS | Lunar Radar Sounder |
| LRR | Launch Readiness Review |
| LS | Launch Segment |
| LSB | Least Significant Bit |
| LTAN | Local Time of Ascending Node |
| LTDN | Local Time of Descending Node |
| LUT | Look-Up table |
| LVA | Launch Vehicle Adapter |
| M&C | Monitoring & Control |
| M5 | 5th Medium Class Mission |
| MAG | Mission Analysis Guidelines / CReMA |
| MAIT | Manufacturing, Assembly, Integration and Test |
| MC | Molecular Contamination |
| MCRR | Mission Commissioning Results Review |
| MDP | Maximum Design Pressure |
| MDR | Mission Definition Review |
| MGA | Medium-Gain Antenna |
| MIP | Mandatory Inspection Point |
| MIP | Mission Implementation Plan |
| MGSE | Mechanical Ground Segment Equipment |
| MIRD | Mission Implementation Requirements Document |
| MIP | Mandatory Inspection Point |
| MLA | Multi Lateral Agreement |
| MLI | Multi-Layer Insulation |
| MOAD | Mission Operations Assumption Document |
| MOC | Molecular Contamination |
| MOC | Mission Operations Centre |
| MOI | Moment of Inertia |
| MOS | Margin of Safety |
| MOU | Memorandum Of Understanding |
| MPP | Milestone Payment Plan |
| MRD | Mission Requirements Document |
| MRO | Master Reference Oscillator |
| MSR | Mars Sample Return |
| MTL | Mission TimeLine |
| MTTR | Mean Time To Repair |
| NaN | Not Applicable |
| N.A. | Not Applicable |
| NAIF | NASA’s Navigation and Ancillary Information Facility |
| NAIF SPICE | NAIF Observation Geometry System for Robotic Space Science Missions |
| NCR | Non-Conformance Report |
| NCTS | Non Conformance Tracking System |
| NDA | Non-Disclosure Agreement |
| NDI | Non-Destructive Inspection |
| NE | North East |
| NECP | Near Earth Commissioning Phase |
| NECR | Near-Earth Commissioning Review |
| NES0 | Noise Equivalent Sigma Zero |
| NIR | Near InfraRed |
| NRA | Negative Roll Angle |
| NRB | Non-Conformance Review Board |
| NRT | Near Real Time |
| NSP | Nominal Science Phase |
| OBC | On-Board Computer |
| OBCP | On-Board Control Procedure |
| OBDH | On-Board Data Handling |
| OBS | Organisation Breakdown Structure |
| OBSM | On-Board Software Maintenance |
| OBSW | On-Board Software |
| OBT | On-Board Time |
| OCM | Orbit Control Manoeuvre |
| ODGM | On-board Data Generation Module |
| OE | Orbit Ellipse frame |
| OGS | Operational Ground Segment |
| OGSE | Optical Ground Support Equipment |
| OIRD | Operations Interface Requirements Document |
| OOP | On-Board Orbit Propagator |
| OoP | Out-Of Plane |
| OPS | Orbit Position Scheduler |
| OTP | Orbit Transfer Phase |
| OZA | Observation Zenith Angle |
| PA | Product Assurance |
| PAC | Particulates Contamination |
| PAF | Payload Adapter Facility |
| PARD | Product Assurance Requirement Document |
| PARD (SC) | Product Assurance and Safety Requirement Document (Space Craft) |
| PARD (INS) | Product Assurance and Safety Requirement Document (Instruments) |
| PCB | Printed Circuit Board |
| PCDU | Power Conditioning and Distribution Unit |
| PCI | Planet-Centered Inertial frame |
| PCIP | Planet-Centered Inertial Plane frame |
| PCM | Pericentre Control Manoeuvre |
| PCR | Planet-Centered Rotating frame |
| PCR | Preliminary Concept Review |
| PDGS | Payload Data Ground Segment |
| PDHS | Payload Data Handling Subsystem |
| PDHT | Payload Data Handling and Transmission |
| PDR | Preliminary Design Review |
| Phase 0 | Mission analysis and identification |
| Phase A | Feasibility |
| Phase B | Preliminary Definition |
| Phase C | Detailed Definition |
| Phase D | Qualification and Production |
| Phase E | Utilisation |
| Phase F | Disposal |
| PFM | Proto-Flight Model |
| PI | Principal Investigator |
| PLAU | Pre-Launch Phase |
| PLID | Planning Interface Document |
| PLM | Pericentre Lowering Manoeuvre |
| PLSR | Preliminary Launch Site Review |
| PM | Project Manager |
| PMAR | Preliminary Mission Analysis Review |
| PMP | Parts, Materials and Processes |
| POI | Products of Inertia |
| POR | Payload Operations Request |
| ppbv | parts per billion volume |
| PPRD | Planetary Protection Requirements Document |
| PPS | Pulse Per Second |
| PRA | Positive Roll Angle |
| PPRD | Planetary Protection Requirements Document |
| PRI | Pulse Repetition Interval (time interval between pulses) |
| PRJ | Performance Requirements Justification |
| PRM | Perigee or Pericentre Raising Manoeuvre |
| PROM | Programmable Read-Only Memory |
| PRR | Preliminary Requirement Review |
| PS | Packet Store |
| PS | Project Scientist (called Study Scientist in phases 0/A/B1) |
| PSA | Planetary Science Archive |
| PTR | Pointing Request |
| PTR | Post Test Review |
| PUM | Pop-Up Manoeuvre |
| PUS | Packet Utilisation Standard |
| PVT | Position Velocity and Time |
| PWS | Plasma Wave instrument, on Galileo satellite |
| QA | Quality Assurance |
| QAR | Qualification and Acceptance Review |
| QM | Qualification Model |
| QMS | Quality Management System |
| QR | Qualification Review |
| R0 | Requirement at level 0 |
| R1 | Requirement at level 1 |
| R2 | Requirement at level 2 |
| R3 | Requirement at level 3 |
| RAAN | Right Ascension of the Ascending Node |
| RAM | Random Access Memory |
| RAMS | Reliability, Availability, Maintainability and Safety |
| RCS | Reaction Control System |
| RD | Reference Document |
| RF | Radio Frequency |
| RFC | Radio Frequency Compatibility |
| RFCT | Radio Frequency Compatibility Test |
| RFD | Request For Deviation |
| RFEA | Radio Frequency Electronics Stack |
| RFI | Radio Frequency Interference |
| RFW | Request For Waiver |
| RIME | RIME sub-surface radar instrument on the ESA JUICE mission |
| RMS | Root Mean Square |
| RMSE | Root Mean Square Error |
| RO | Radio Occultation |
| RoHS | Restriction of Hazardous Substances |
| ROI | Region of Interest |
| ROI-E | Region of Interest – Exploration Scale |
| ROI-R | Region of Interest - Reconnaissance Scale |
| ROM | Read-Only Memory |
| RoM | Rough Order of Magnitude |
| RPE | Relative Pointing Error |
| RPWS | Plasma wave instrument on Cassini |
| RSE | Radio Science Experiment on Envision. The name changed to VeRSE in 2026. |
| RSS | Root Sum of Squares |
| RW | Reaction Wheel |
| S-band | Radar frequency, 2-4 GHz |
| S/W | Software |
| SA | Solar Array |
| SADM | Solar Array Drive Mechanism |
| SAE | Swath Angular Error |
| SAP | Science Activity Plan |
| SAR | Synthetic Aperture Radar |
| SARD | Spacecraft AIV/T Requirement Document |
| SCDB | Satellite Characterisation Data Base |
| SCET | Spacecraft Elapsed Time |
| SCF | Software Configuration File |
| SCI-EP | Solar System Section, ESA's Science Directorate |
| SCI-PV | Envision Project, Projects Department, ESA's Science Directorate |
| SciRD | Science Requirements Document |
| SCI-SCP | Solar System Section, Science and Operations Department, ESA's Science Directorate |
| SCI-SO | Mission Operations Division, ESA's Science Directorate |
| SCOE | Special Check-Out Equipment |
| SCP | System Commissioning Phase |
| SDB | Spacecraft Database |
| SDE | Software Development Environment |
| SE | System Engineering |
| SEE | Single Event Effect |
| SEP | System Engineering Plan |
| SES | Sun-Earth-Spacecraft Angle |
| SESC | Sun-Earth-Spacecraft Angle |
| SET | Single Event Transient |
| SEU | Single Event Upset |
| SEWG | Science Engineering Working Group |
| SGICD | Space to Ground Interface Control Document |
| SGS | Science Ground Segment |
| SGICD | Space to Ground Interface Control Document |
| SHARAD | SHAllow RADar on Mars Reconnaissance Orbiter (MRO) probe |
| SI | International System of Units |
| SIOV | Satellite In-Orbit Verification |
| SIP | Science (Ground Segment) Implementation Plan |
| SIRD | Science (Ground Segment) Implementation Requirements Document |
| SIRD | Software Interface Requirements Document |
| SIS | Spacecraft Interface Simulator |
| SMP | Science Management Plan |
| SNR | Signal-to-Noise Ratio |
| SOAD | Science Operations Assumption Document |
| SOC | Science Operations Centre |
| SOCD | Science Operations Concept Document |
| SOIA | Science Operations Implementation Agreement |
| SOL | Switch-Off Line |
| SOM | Spacecraft Operations Manager |
| SOP | Science Operations Planning |
| SORD | Science Operations Requirement Document |
| SORS | Science Operations Reference Scenario |
| SOVT | System Operational Validation Test |
| SOW | Statement Of Work |
| SOWG | Science Operations Working Group |
| SP | Source Packet |
| SPF | Single Point Failure |
| SPICAV | Imaging spectrometer for ultraviolet and infrared radiation on Venus Express |
| SPICE | Spacecraft, Planet, Instrument, C-matrix, Events |
| SPR | Software Problem Report |
| SRD | System Requirement Document |
| SRDB | Spacecraft Reference DataBase |
| SRP | Solar Radiation Pressure |
| SRR | System Requirements Review |
| SRS | Subsurface Radar Sounder, instrument on Envision. The name changed to VESPER in 2026. |
| SRS IRD | Subsurface Radar Sounder (SRS) Instrument Requirements Document |
| SS | Study Scientist |
| SSAC | Space Science Advisory Committee |
| SSCE | Sun-Spacecraft-Earth Angle |
| SSMM | Solid State Mass Memory |
| SSP | Sub-Satellite Point |
| SSPA | Solid State Power Assembly |
| SSRD | Spacecraft System Requirements Document |
| SST | Science Study Team |
| STM | Structural and Thermal Model |
| STR | Star Tracker |
| SVF | Software Validation Facilities |
| SVP | Software Verification Plan |
| SVT | System Validation Test |
| SW | Software |
| SWL | SRS pulse receive window |
| SWT | Science Working Team |
| SZA | Sun Zenith Angle |
| T/M | Thrust to Mass ratio |
| TB | Thermal Balance |
| TBC | To Be Confirmed |
| TBD | To Be Defined |
| TBD | To Be Determined |
| TBR | To Be Reviewed |
| TBTV | Thermal Balance Thermal Vacuum |
| TBW | To Be Written |
| TCN | Geocentric Track, Cross-Track, Nadir frame |
| tcn | Tangent, Cross-track, Normal frame |
| TCM | Trajectory Correction Manoeuvre |
| TDS | Test Data Set |
| TESS | Tailoring of Engineering StandardS |
| TM/TC | Telemetry and Telecommands |
| TMM | Thermal Mathematical Model |
| TN | Technical Note |
| TOD | True Of Date |
| TRB | Test Review Board |
| TRL | Technology Readiness Level |
| TRP | Temperature Reference Point |
| TRR | Test Readiness Review |
| TS | Technical Specification |
| TSM | Temperature Sensor Monitoring |
| TTC | Telemetry, Tracking, Command |
| TV | Thermal Vacuum |
| UFoV | Unobstructed Field of View |
| UM | User Manual |
| URD | User Requirement Document |
| US | United States of America |
| USO | Ultra-Stable Oscillator |
| UTC | Universal Time Coordinated |
| VC | Virtual Channel |
| VCB | Verification Control Board |
| VCD | Verification Control Document |
| VCD | Venus Climate Database |
| VCI | Venus-Centered Inertial frame |
| VCIP | Venus-Centered Inertial Plane frame |
| VCR | Venus-Centered Rotating frame |
| VenSpec | Venus Spectrometer Suite |
| VenSpec-H | High-resolution infrared spectrometer, instrument on Envision |
| VenSpec-M | Near-Infrared Mapping Spectrometer, instrument on Envision |
| VenSpec-U | Ultraviolet Spectral Imager, instrument on Envision |
| VESPER | VEnus Surface PEnetrating Radar, instrument on Envision |
| VeraSAR | Venus radiometer altimeter & SAR |
| VeRSE | Venus Radio Science Experiment, instrument on Envision. |
| VEx | Venus Express |
| VHF | Very High Frequency |
| VIRTIS | Visible and InfraRed Thermal Imaging Spectrometer on Venus Express |
| VIRTIS-M | VIRTIS high-resolution visible and infrared imaging channel in the 0.28–5 µm range at moderate spectral resolution |
| VMC | Venus Monitoring Camera, on VenusExpress ESA mission |
| VME | Venus Mean Equator frame |
| VOI | Venus Orbit Insertion |
| WBS | Work Breakdown Structure |
| WCA | Worst Case Analysis |
| WOL | Wheel Off-loading |
| WP | Work Package |
| X-band | Radar frequency, 8 - 12 GHz |
| XML | eXtended Markup Language |
| YPR | Yaw, Pitch, Roll |